Skip to content
Independent marine survey & inspection desk · 25 Indonesian ports Reports in English · Fees in USD

Home Journal Commercial & Cargo Bunker Quantity Survey: Procedure, Wedge Formula & Common Disputes

Commercial & Cargo

Bunker Quantity Survey: Procedure, Wedge Formula & Common Disputes

How a bunker quantity survey is carried out: tank gauging, temperature profiles, volume correction to 15 °C, the wedge calculation, sampling — and the three disputes that come up every time.

Engine Room — independent marine survey, Indonesia
Engine Room — documentary reference image, Marine Survey Indonesia
Direct answer

A bunker quantity survey gauges every fuel tank before and after transfer, takes temperature at multiple depths, corrects observed volume to 15 °C using the product’s correction table, applies density from a representative sample, and calculates the wedge in partly filled tanks. The report states vessel, barge and surveyor figures separately.

The procedure

  1. Initial gauging of every bunker tank — ullage or sounding — with trim and list corrections from the vessel’s own tables.
  2. Temperature at three depths per tank. Heated fuel oil stratifies, and a single reading misstates the volume.
  3. Wedge calculation where a tank is partly filled and trim prevents the liquid reaching the sounding point.
  4. Transfer observed, with the barge’s own figures recorded independently.
  5. Representative drip or line sample taken, sealed and split three ways — vessel, supplier, surveyor.
  6. Final gauging repeated identically, volume corrected to 15 °C, density applied to give mass.
  7. Report shows vessel figure, barge figure and surveyor figure side by side, with the difference stated plainly.

The wedge, in plain terms

When a tank is not full and the vessel is trimmed by the stern, the fuel lies as a wedge that may not reach the forward sounding pipe. Sounding gives zero, the tank is recorded as empty, and a real quantity of fuel vanishes from the calculation. The wedge formula reconstructs that volume from the trim, the tank geometry and the actual sounding. On a vessel with several partly filled tanks it is regularly the largest single disputed figure in the survey.

The three disputes that come up every time

Common bunker disputes and how they are resolved
Dispute Root cause How it is settled
Quantity short against the delivery note Barge meter versus vessel tank gauging; temperature and density differences; the wedge Independent gauging both ends, corrected to 15 °C, with the working shown
Density different from the bunker delivery note Sample not representative, or taken from the wrong point Continuous drip sample at the manifold, sealed and split three ways
Quality off-specification after delivery Contamination, commingling with existing stock, or a genuinely off-spec parcel Retained sealed samples analysed by an accredited laboratory

On-hire and off-hire bunkers

The same method applies at charter delivery and redelivery, where the quantity remaining on board is a payment item. Doing this properly at both ends removes an entire category of charter dispute — see the on-hire and off-hire guide.

Frequently asked questions

What is included in a bunker survey?

Tank-by-tank gauging before and after with temperature profiles, volume correction to 15 °C, density from a representative sample, the wedge calculation, sampling and sealing, and a three-way figure comparison.

Who pays for the bunker survey?

Whoever is exposed to the quantity: the buyer of the bunkers, the charterer, or the owner under a charterparty. Suppliers occasionally instruct their own.

How long does a bunker survey take?

Two to six hours depending on tank count and transfer duration, plus the report within one to two working days.